Edit French Prior Declaration of Works (Cerfa 16702) online free, or download the PDF

France prior declaration of works form (Cerfa 16702, déclaration préalable)

Français

Quick answer: Cerfa 16702*03 is the French prior declaration (déclaration préalable, DP) form for building work, work on an existing building and changes of use that do not need a building permit. You file it with the town hall where the project is located, on paper or online depending on the town. The review period is normally 1 month. The current version is 16702*03. Checked against the official Ministère chargé de l'urbanisme website on 2026-10-25.
1. Download the official French Prior Declaration of Works (Cerfa 16702)

Step 1: the official PDF opens in a new tab. Save it with the download button, then come back to this page.

or drag the file onto this page

  • ✓ Official current version
  • ✓ Free download, no account
  • ✓ No card, no trial
  • ✓ Never uploaded

French Prior Declaration of Works (Cerfa 16702) in short

Cerfa 16702*03 is the French prior declaration (déclaration préalable, DP) form for building work, work on an existing building and changes of use that do not need a building permit. You file it with the town hall where the project is located, on paper or online depending on the town. The review period is normally 1 month.

Issued byMinistère chargé de l'urbanisme (formulaire diffusé par Service Public)
Current version16702*03 (checked 2026-10-25)
Who fills it inThe landowner or their representative, the buyer of the property, a company authorised by the owner, a joint owner, a building manager (syndic) or co-owner, or the beneficiary of an expropriation.
Who receives itThe town hall (mairie) of the town where the project is located, or its planning department.
Where to send it2 copies by registered post with acknowledgement of receipt, or by hand at the town hall against a receipt. Depending on the town you can also file online (AD'AU or the town's own service), by email or contact form. In towns over 3,500 inhabitants, a company or other legal entity must file electronically only.
DeadlineNo filing deadline, but you must file before starting work. The town hall has 1 month to review a complete file and 1 month from filing to say a file is incomplete. Periods differ in protected areas.
FeeFiling is free. Planning taxes (taxe d'aménagement, preventive archaeology) may be due later, based on a declaration to the tax office within 90 days of completing the work.
Official linksOfficial page · Official PDF · Official instructions

What changed

The official form record says version 16702*03 has been valid since 1 July 2026.

How to fill out French Prior Declaration of Works (Cerfa 16702), line by line

Box 1Declarant identity
Section 1.1 for an individual (name, date and place of birth) or 1.2 for a legal entity (name, SIRET, representative).
Box 2Declarant contact details
Address, phone and email. You can agree to receive letters from the authority electronically.
Box 3The land
Address of the land, land registry references (section, number, area) and legal status. For several plots, use the land registry annex.
Box 4.1Type of work planned
Describe the project: new building, work on an existing building, change of use.
Boxes 4.3 and 4.4Footprint and floor area table
Give the ground footprint and the existing, created and removed floor area by use. An official floor area calculation sheet is available.
Box 4.5Parking
Number of parking spaces before and after the work, if relevant.
Box 6Road and network contribution
Only if the land is subject to the PVR contribution and the owner is not the declarant.
UndertakingPlace, date and signature
The declarant confirms they are entitled to file and that the information is correct, then signs.
ChecklistAttached documents
Tick the documents attached: a location plan for every project, then where relevant a site plan, cross section, elevation and roof plans and other documents.

Common mistakes to avoid

  • Starting work before the review period ends, or without posting the receipt and the sign on site.
  • Leaving out the location plan, which every project needs.
  • Filing a prior declaration when the project needs a building permit.
  • Not checking with the town hall whether the land is in a protected area, which changes the file and the periods.
  • Posting one copy instead of 2.
  • Not answering a request for missing documents within 3 months, which counts as a refusal.
  • Forgetting the tax declaration within 90 days of completing the work.

Questions about French Prior Declaration of Works (Cerfa 16702)

Which cerfa do I use for a déclaration préalable in France?

For building work not needing a building permit, Service Public points to Cerfa 16702*03. For landscaping or land works not needing a development permit, the form points to Cerfa 16703.

How long does the town hall take?

1 month from filing a complete file. With no reply in that time, the project is tacitly approved (non-opposition). The period differs in protected areas.

Can I file online?

Yes, if your town offers it, through the AD'AU service or the town's own online service. Ask your town hall.

How many copies do I file?

In the general case, 2 copies by registered post or by hand. Rules differ in protected areas.

What do I do after approval?

Post the receipt and a sign visible from the public road on the site for the whole duration of the work. A third party can challenge the decision within 2 months of the sign going up.

Related forms

Tools for this form

Sources

Checked against the official sources on 2026-10-25. PDF Editor Hub is not affiliated with the Ministère chargé de l'urbanisme or any government agency. This page is general information, not legal or tax advice.